← All Services
08 / Insurance Reinstatement

Fire, flood and impact damage rebuilds.

One contractor for the whole claim — from the 3am make-safe call through to a property handed back, signed off and ready to live in. We work directly with homeowners, loss adjusters and insurers across Leeds, Wakefield and the wider Yorkshire region.

— What we cover

End-to-end reinstatement, in-house.

01

Emergency make-safe

24/7 response for fire, flood and impact incidents. Propping, sheeting, board-up and isolation of services to make the property safe within hours.

02

Strip-out & survey

Controlled removal of fire- and water-damaged fabric, drying-out, structural assessment and a written scope agreed with the loss adjuster.

03

Full reinstatement

Single principal contractor for the whole rebuild — groundworks, masonry, roofing, electrical, plumbing, plastering, joinery and decoration.

04

Traffic & site management

Highway licences, scaffold, footway closures and water-filled barriers coordinated directly with the council where the incident affects the public realm.

— Incident types

From a single damp ceiling to a whole terrace rebuild.

Fire damage

From smoke-affected single rooms to terraces gutted floor to roof — strip-out, structural reinstatement, new roofs and full internal fit-out.

Flood & escape of water

Drying, dehumidification, replacement of plaster, joinery, kitchens, flooring and rewiring of affected circuits.

Vehicle impact

Emergency propping, underpinning, façade and roof rebuild in matched materials, with highway management for the duration of works.

Storm & structural damage

Roof reinstatement, chimney rebuilds, lead and flashing renewal, and repair of wind- or water-damaged elevations.

— Recent insurance projects

Case studies.

Vehicle impact · Cleckheaton — image 1
Vehicle impact · Cleckheaton — image 2
Vehicle impact · Cleckheaton — image 3
Vehicle impact · Cleckheaton

Stone terrace rebuilt after a car crashed into the gable

Emergency make-safe within hours, underpinning, matched-stone façade rebuild, new roof and ten weeks of council-permitted traffic management on a live highway.

Read case study
Fire damage · Idle, Leeds — image 1
Fire damage · Idle, Leeds — image 2
Fire damage · Idle, Leeds — image 3
Fire damage · Idle, Leeds

Three Victorian terraces gutted by fire — rebuilt bottom to top

Full strip-out of three adjoining houses after a serious fire, new cut roof spanning all three properties, masonry repairs and complete internal fit-out to handover.

Read case study
— Quick enquiry

Report an incident or insurance claim

Free quotations. No obligation. We respond within one working day.

— Get in touch

Planning a project?

Speak to EPS Leeds today. One trusted contractor for the entire build — from first sketch to final handover.

Start a Consultation →
Call EPS LeedsRequest a Free Quote